- ЈезикAfrikaans Argentina Azərbaycanca
Bahasa Indonesia Brasil Brezhoneg
Català Česky Dansk
Deutsch Dhivehi English
English English Español
Esperanto Estonian Euskara
Finnish Français Français
Gaeilge Galego Hrvatski
Íslenska Italiano Latviešu
Lëtzebuergesch Lietuviu Magyar
Malay México Nederlands
Norsk bokmål Norwegian nynorsk Polski
Português Română Slovenšcina
Slovensky Srpski Svenska
Tiếng Việt Türkçe Wolof
Ελληνικά Български Македонски
Монгол Русский Српски
Українська עברית العربية (مصر)
العربية العربية پارسی
कोंकणी বাংলা ગુજરાતી
தமிழ் ಕನ್ನಡ ภาษาไทย
ქართული ខ្មែរ 中文 (繁體)
中文 (香港) 日本語 简体中文
한국어
Почетна / Our House 44
Погледај:
Месечни попис
Датум објаве: / 2010 / Мај
- New laundry sink
They basically glued the sink to the wall and left the old faucet, so when you turn it off or on (when the water's not on full-blast), some trickles through the holes. - Sink
This was our only real complaint about the work - the way they did the sink. Problem 1: it's not level, and water pools in the bottom and stays there. Problem 2 is more obvious in the next photo. - The built in entertainment center. It's not pretty but it's better than nothing
- Bathroom, post-drywall.
- Family room, after drywall was put up.
- There's a bit of a tear in the drywall near the floor...hopefully a baseboard will cover that up.
- DSCN2622.JPG
Still day 1 - DSCN2621.JPG
This is where our outgoing sewer pipes are. (Still day 1.) - DSCN2620.JPG
Still day 1 - DSCN2619.JPG
Water-filled trench at the wall. We're calling it our moat. - Day 1 (corner)
On day 1, they jackhammered a trench around the outer wall in the unfinished part. When we looked after they were done, we found that it was filled with water. This made it obvious that we really needed to have this work done. - Another view of the moat
- The moat
As you can see, the moat goes the entire length of the wall. - DSCN2615.JPG
This is the pipe they were using to pump out the water in the trench. Note the splashes on the walls. - wisteria_020.jpg
Wisteria 2006